Our products: vertical turbine pump, vertical wet pit pump, vertical oil sump pump, vertical condensation pump, right Angle gearbox
DATE:2024/11/20 22:02:02
Visits:
Carefully lift the bowl assembly to vertical with clamp and straps. See below.
When installing a long 6” or 8” bowl assembly, leave the bowl assembly securely fastened to the wooden skid that is attached for shipping until the bowl assembly is raised to vertical position.
Do not allow the weight of the bowl assembly to rest on the bell lip.
Copyright © 2002-2022 Hunan machinery manufacturing co., LTD. All Rights Reserved.
+8618507312158
WeChat Qr Code